Type | Wastewater |
---|---|
name | Cahaba WRF Electrical System Sustainability/Redundancy Improvements – A Case Study |
Speaker 1 | Bernard Pettiford |
speaker1_email | Email hidden; Javascript is required. |
speaker1_phone | (404) 720-1265 |
speaker1_rep | N/A |
speaker1_bio | Mr. Pettiford has been in the Environmental Engineering field in one way shape of form since 1997. He is an electrical engineer with experience developing detailed electrical designs for new/existing water and wastewater treatment facilities, performing power system analysis, developing electrical safety programs, performing electrical safety training and performing electrical oversight during construction. Mr. Pettiford has experience with startup commissioning, NFPA, and OSHA requirements. He is client focused and results driven. |
Abstract Text | CDM Smith performed an Arc Flash Study Report at the Cahaba Water Reclamation Facility (WRF) in Jefferson County, AL. The study noted four key concerns, which were out-of-scope for the arc flash study but required attention. Those concerns included:
As a result of the information learned in the Arc Flash Study, CDM Smith was contracted to develop an Electrical Master Plan and electrical design to address the concerns. The new design replaces the existing 2.4kV radial system to 12.470kV dual radial, secondary main-tie-main configuration. This presentation will cover the following:
|